masthead-bg

Altamira & Monterrey Terminal Projects

AdobeStock_222397562-scaled

Valero

Altamira & Monterrey Terminals

Location: Mexico

These projects involved comprehensive infrastructure for fuel storage and distribution, including Ship Unloading, Rail Loading, and Automated Truck Rack Loading facilities with a total of 4 Loading Bays across both sites. Storage capacities include 13 tanks with a combined total of 1,525,000 barrels (bbl.), containing Regular & Premium Gasoline, Diesel, and MTBE. Each site features Vapor Recovery Units, Metering Systems, Pumps, Additive Injection, Automation Systems, Control Buildings, and Firewater Systems to ensure operational safety and efficiency. The first site includes 8 storage tanks (1,100,000 bbl.) and the second site includes 5 storage tanks (425,000 bbl.).

Scope of Work: 

  • FEED
  • Project Management 
  • Procurement
  • Construction Management